• Zachariah@lemmy.world
    link
    fedilink
    arrow-up
    5
    ·
    5 months ago

    Originally slated to cost around $5 billion and fire up in 2020, it has now suffered multiple delays and its budget swelled beyond $22 billion, with an additional $5 billion proposed to cover additional costs. These unforeseen expenses and delays are behind the most recent, 15-year delay.

    • davel [he/him]@lemmy.ml
      link
      fedilink
      English
      arrow-up
      4
      ·
      edit-2
      5 months ago

      And now France is installing far-right government. It will be worse than when Reagan removed the solar panels from the roof of the White House.

  • davel [he/him]@lemmy.ml
    link
    fedilink
    English
    arrow-up
    4
    arrow-down
    2
    ·
    edit-2
    5 months ago

    China may beat them to the punch. China reports fusion breakthrough with HH70 Tokamak

    By 2027, Energy Singularity aims to build a next-generation tokamak, a steady-state, high-magnetic-field, high-temperature superconducting model. This project will lay the groundwork for commercially viable fusion energy acquisition, with an ultimate goal of a demonstration power plant by 2030 […].

    • zksmk@lemmy.mlOP
      link
      fedilink
      English
      arrow-up
      5
      ·
      5 months ago

      China may beat them to the punch.

      Maybe, maybe not, but China is part of ITER, funding 10% of it.