    Are you able to link the source document?

    However, as an example of why nuclear is seen as risky, time-consuming and subject to massive cost blowout and time delays, see Flamanville 3 ( https://www.world-nuclear.org/information-library/country-profiles/countries-a-f/france.aspx Under “new nuclear capacity”)

    It’s gone from being a project started in 2004 to build a 1650MWe plant costing 4.2 billion euros (in 2020 euros), to an estimated completion date of 2024, at 13.2 billion euros.

    And this is France, a country that is very familiar and well-versed with building nuclear reactors.

    Without the source document, this may well be the example you use from your 2nd bullet point. But I wouldn’t have called this a startup.

      • muntedcrocodile@lemmy.world
        link
        fedilink
        arrow-up
        1
        ·
        8 months ago

        THEY FUCKING MISSED AN ENTIRE CLASS OF NUCLEAR REACTOR. They had one fucking job compare all the power options and they ignored any reactor that was not a small scallable bullshit silicon valley hyptrain piece of shit. This “unbiassed” report funded with million of dollars just happened to accidentally forget the cheapest and most economically efficient reactor design this is heigly sus and very much looks like it is purposefully misleading. I thought the CSIRO was unbiassed but this is an aggressiouse error that canot be overlooked.

        • ⸻ Ban DHMO 🇦🇺 ⸻@aussie.zoneOP
          link
          fedilink
          English
          arrow-up
          1
          ·
          edit-2
          8 months ago

          Their rationale for why larger Nuclear Reactors were not and could not be included in the report seem to make sense.

          GenCost has been advised by stakeholders that small modular reactors are the appropriate size nuclear technology for Australia. Australia’s state electricity grids are relatively small compared to the rest of the world and planned maintenance or unplanned outages of large-scale nuclear generation would create a large contingent event of a gigawatt or more that other plants would find challenging to address.

          In the present system, it would take two or more generation units to provide that role. As such, large-scale nuclear plants which are currently lower cost than nuclear SMR, may not be an option for Australia, unless rolled out as a fleet that supports each other - which represents a much larger investment proposition.

          The second issue is that observations of low cost nuclear overseas may in some cases be referring to projects which were either originally funded by governments or whose capital costs have already been recovered. Such prices will not be available to countries that do not have existing nuclear generation such as Australia.

          For more detail go to GenCost section 2.4.4 Perceived inconsistency between high nuclear SMR capital costs and low-cost nuclear electricity overseas from page 17.

          Have you actually read the report or do you just get your opinions from Sky News?

          • muntedcrocodile@lemmy.world
            link
            fedilink
            arrow-up
            1
            ·
            8 months ago

            I read the report then went and spoke to my engineering proffessor for nuclear engineering and confirmed that csiro where being dickheads. Why not include it anyways and still give that disclaimer and let the people judge still seems misleading to totally leave it out.

            • ⸻ Ban DHMO 🇦🇺 ⸻@aussie.zoneOP
              link
              fedilink
              English
              arrow-up
              1
              ·
              8 months ago

              How would people be able to accurately judge the cost factors of a solution which cannot be priced properly as there are no projects to compare with? It would be completely useless in the report. That’s without considering the time it would take for the supposedly “cheaper” Nuclear option to be operational. It would’ve been a good idea maybe 30-40 years ago, but it would not be suitable today considering the urgency of climate change

              • muntedcrocodile@lemmy.world
                link
                fedilink
                arrow-up
                1
                ·
                8 months ago

                First there ars more large scale nuclear plants globaly bullshit we dont have a comparison. Second we dont know that they didnt run the numbers so we cant make the comparison.