• Name-Not-Applicable@kbin.social
    link
    fedilink
    arrow-up
    6
    ·
    1 year ago

    Some of those panels and indicators seem to be lit. Is there power? Is some of that still working? I would have thought that whole thing would be powered down, including all its support mechanisms.

      • IBurnedMyFingers@discuss.tchncs.de
        link
        fedilink
        English
        arrow-up
        5
        ·
        edit-2
        1 year ago

        It is not, these control rooms are rather central to the plant. If I am not mistaken this is the reactor 4 panel, and immediately to the right of this image is the original concrete sarcophagus. The plant still has electrical power for some of the monitoring stuff, and the lights are still on (at least last I knew about) for maintenance and tour groups.

        Here is another angle with the lighting and concrete visible. As you can tell, the concrete on the left is not the same type as the ceiling.

        The control rooms for reactors 1-3 are still in pretty decent shape, as they were operating much after the meltdown. There are also schematics available online if you want to see how these rooms are positioned within the plant.