- cross-posted to:
- technology@zerobytes.monster
- cross-posted to:
- technology@zerobytes.monster
[T]he report’s executive summary certainly gets to the heart of their findings.
“The rhetoric from small modular reactor (SMR) advocates is loud and persistent: This time will be different because the cost overruns and schedule delays that have plagued large reactor construction projects will not be repeated with the new designs,” says the report. “But the few SMRs that have been built (or have been started) paint a different picture – one that looks startlingly similar to the past. Significant construction delays are still the norm and costs have continued to climb.”
I’m not claiming to be any more knowledgeable than what I read here, but Wikipedia says
https://en.wikipedia.org/wiki/Thorium-based_nuclear_power
I didn’t say anything about thorium. Not all molten salt reactors are thorium though. In fact not all high temperature reactors are molten salt either. People keep mixing these technologies up.